您现在的位置 : 首页  新闻中心

新闻中心

100句教你攻克模具沟通障碍英语

     

  All in English& Imperial Unit.全部使用英文和英制单位

  Are part dimensions to print plus shrink?请检查内模尺寸有否乘缩水?

  All wires protected from sharp corners?凡有电线通过的角位要改为R角,是否完成?

  All replaceable components must be standard components.所有替换的元件必须是标准件。

  Add shot counter?是否加啤塑总计器?

  A complicated mould with thorough design consideration to overcome the numerous design contraints.

  一个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的限制。

  All moving components should use hardened steel : all slides should be installed with hardend or lubricated alloy wear plates and gibs, and with positive slide retainer.

  所有移动的零件应使用硬钢料,行位必须用硬垫板和硬线条,而且必须有限位及定位锁。

  BOM including water fittings,ejectors&custom components.BOM的内容应包含运水接头,顶针和自制的零件.

  BeCu for lifters if w/o water circuits。若没有运水回路,斜顶为铍铜。

  Corresponding components mirrored at core&cavity对应的部件在前、后模平面视图中镜像

  Check polish for line of draw finish?有否省光就出模?

  Core pull slot mechanism installed and O.K.

  Crane capacity and loading clearance.模具须用多大吊机才可搬动。

  Conduct moldflow &mold warp analysis.经流道及变形电脑模拟分析。

  Component and/or 3D mould design drawing.散件图或3D模具图

  Cooling less important when dimensions are not important.若尺寸不重要,适量冷却也可。

  Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould which help to double the moulding capacity and reduce production cost.

  将一个标准四模腔大水口模具与一个四模腔倒转大水口模具结合成为一套可于同一大小的注塑机,生产量可增加一倍的层板模具,并且可降低成本。

关于我们

联系方式

海盐博力模具厂
电  话:13967322918
传  真:0573-86968318
邮  编:314300
Email:[email protected]
网  址:www.zgbzjmjw.com